A new upper floor added over the existing footprint, new roof and exterior cladding, a rebuilt kitchen, marble bathrooms with walk-in showers, and a new driveway.
These are our own site photographs, taken across the build — the album below has every one of them, from the first day of demolition to the finished rooms.
在既有坪數上加蓋二樓、新屋頂與外牆;廚房重建;大理石浴室與走入式淋浴;車道重鋪。
以下都是我們自己在工地拍的照片,完整相簿包含全部 53 張 —— 從拆除第一天到完工後的樣子。
View the full album (53 photos)