CA Contractor License #1040455
Han's Builder Construction General Contractor · Bay Area
Free Estimate
Home  /  Services  /  Sunnyvale

Whole-Home Remodeling in Sunnyvale

Bringing a 1960s Sunnyvale ranch house up to how people actually live now — one permit, one crew, one schedule.

Sunnyvale has a lot of single-storey ranch houses from the late 1950s and 60s. They were built well, but the electrical, plumbing and room layout have usually been outgrown.

A whole-home remodel lets us fix all of it under one permit and one schedule: open the kitchen to the family room, rebuild the bathrooms, upgrade the panel, replace the windows and finish it consistently throughout.

Sunnyvale 有大量 1950 年代末到 60 年代的單層牧場式住宅。房子本身蓋得紮實,但電容量、管線與隔間早就跟不上現在的生活。

整棟翻新的好處是:一張建照、一份工期,把廚房打開、浴室重做、電盤升級、窗戶更換一次做完,風格也能統一。

What a whole-home remodel covers

Selective wall removal and layout changes, kitchen and all bathrooms, flooring and trim, doors and windows, electrical service and circuits, plumbing and water heater, insulation, drywall, paint, and lighting design.

整棟翻新包含什麼

選擇性拆牆與格局調整、廚房與全部浴室、地板與收邊、門窗、電盤與迴路、給排水與熱水器、隔熱、隔間、油漆與燈光規劃。

What drives the cost

How many walls move, how many bathrooms, whether the electrical service and panel are replaced, window count and quality, and whether you stay in the house during the work (phasing costs more than an empty house).

費用由什麼決定

動了幾個牆、幾間浴室、電盤與進屋線是否更換、窗戶數量與等級,以及施工期間是否住在家裡(分段施工比空屋施工貴)。

How long it takes

3–6 months for a typical whole-home remodel, phased so that one bathroom and the kitchen stay usable as long as possible.

工期

一般整棟翻新約 3–6 個月,會分階段進行,盡量讓一間浴室與廚房維持可用。

Permits

Structural, electrical, plumbing and mechanical all require City of Sunnyvale permits and inspections. We handle the submittal, the corrections, and the final inspection.

建照

結構、電、水、空調都需要 Sunnyvale 市府的建照與勘驗。送件、補正與完工勘驗都由我們處理。

Questions we get asked

常見問題

Should we remodel in stages or all at once?

All at once is cheaper and faster per square foot, because trades are already on site and walls are already open. Staging makes sense when budget or living arrangements force it — we will price both so you can compare.

Can we live in the house during a whole-home remodel?

Yes, if we phase it: one bathroom and a temporary kitchen stay functional. It adds time, and we plan the dust and power shutdowns with you in advance.

Do you upgrade the electrical panel?

If it is a 100-amp panel from the 1960s feeding a modern kitchen and EV charger, usually yes. That decision comes out of the load calculation, not a guess.

How do you handle surprises behind the walls?

We open a few inspection points during the estimate when the house is old enough to warrant it, and we price known risks separately so a discovery becomes a written change order, not a surprise invoice.

Recent work 相關工程

Free on-site estimate   Call 408-966-0885