Most San Jose kitchens we open up were built between 1955 and 1980. That usually means a wall between the kitchen and the dining room, undersized electrical, one small window, and cabinets that have been refaced once already.
We take the room back to the studs when it needs it, move the plumbing and gas only when the new layout earns it, and rebuild with materials that survive a family kitchen — not a showroom.
我們在 San Jose 打開的廚房,大多是 1955–1980 年間蓋的:廚房和餐廳中間一道牆、電容量不足、只有一扇小窗、櫥櫃之前已經換過一次皮。
需要的時候我們會拆到見骨架,水電與瓦斯只在動線真的改善時才移,用料以「家庭每天在用」為標準,而不是樣品屋。
Layout changes and wall removal (with structural review first), new cabinets and countertops, tile and backsplash, under-cabinet and recessed lighting, plumbing and gas re-routing, dedicated circuits for appliances, ventilation, and paint and trim to finish.
格局調整與拆牆(先做結構確認)、新櫥櫃與檯面、磁磚與背牆、櫥下燈與嵌燈、水電與瓦斯改管、電器專用迴路、抽油煙機排氣,最後油漆與收邊。
Four things decide the number: whether the layout changes (moving plumbing, gas and electrical is the biggest single cost), the cabinet and counter package, the appliance allowance, and how much of the old kitchen has to be brought up to current code while it is open.
四個因素決定價格:格局是否變動(移水電瓦斯是最大一筆)、櫥櫃與檯面等級、家電預算,以及拆開之後有多少舊廚房必須順勢做到現行法規。
A same-footprint refresh is typically 3–5 weeks on site. A full down-to-studs remodel with layout changes runs 6–10 weeks, plus 4–8 weeks of cabinet lead time that we order before demolition starts, so it does not sit idle.
不動格局的翻新約 3–5 週。拆到骨架、改格局的完整翻新約 6–10 週,另外櫥櫃交期 4–8 週 —— 我們在拆除前就下訂,避免工地空等。
Structural, electrical, plumbing, gas and mechanical work needs a permit from the City of San Jose. We prepare the drawings, submit, and meet the inspector on site — you do not have to chase paperwork.
結構、電、水、瓦斯與空調工程都需要向 San Jose 市政府申請建照。圖說、送件與現場勘驗都由我們處理,你不需要跑公文。
There is no single number — a cosmetic refresh with new doors and counters is a different project from a down-to-studs rebuild with moved plumbing. We measure the room and give you an itemised written estimate after a free on-site visit, so the number is tied to your actual kitchen.
Yes for anything electrical, plumbing, gas, mechanical or structural. Swapping cabinet doors or repainting does not need one. We handle the permit and inspections for you.
Usually yes, but only after we confirm whether it is load bearing and what has to carry the load instead. That check happens at the estimate stage, before anyone swings a hammer.
Plan for 3–10 weeks depending on scope. We set up a temporary sink and work area where possible, and keep the rest of the house clean and dust-controlled with plastic barriers.
Yes — Santa Clara, Sunnyvale, Cupertino, Campbell, Saratoga, Los Gatos, Milpitas, Mountain View, Palo Alto and Foster City.