CA Contractor License #1040455
Han's Builder Construction General Contractor · Bay Area
Free Estimate
Home  /  Services  /  Cupertino

Kitchen & Bathroom Remodeling in Cupertino

Two rooms where the details show every day. Waterproofing, alignment and finish quality decide whether a bathroom still looks right in five years.

Kitchens and bathrooms are 80 percent hidden work: waterproofing, slope, blocking for grab bars, proper venting, dedicated circuits and correctly sized drains.

We do that part first and finish second, which is why our bathrooms do not come back with a soft corner or a cracked grout line two years later.

廚房與浴室有 80% 是看不到的工程:防水、洩水坡度、扶手補強、排氣、專用迴路、正確管徑。

我們先做好這一層,才做表面 —— 這也是我們的浴室兩年後不會出現軟角或裂縫磁磚的原因。

Bathrooms

Full gut and rebuild, tub-to-shower conversion, waterproofing membrane systems, tile and stone, vanities, fixtures, ventilation and lighting. Curbless and walk-in showers where the framing allows.

浴室

全拆重建、浴缸改淋浴、防水膜系統、磁磚與石材、浴櫃、衛浴設備、排氣與燈光。結構允許時可做無門檻、走入式淋浴。

Kitchens

Cabinetry and countertops, backsplash, sink and faucet, appliance installation, under-cabinet and recessed lighting, dedicated circuits, range hood venting to the exterior.

廚房

櫥櫃與檯面、背牆、水槽與龍頭、家電安裝、櫥下燈與嵌燈、專用迴路、抽油煙機外排。

What drives the cost

Layout changes, tile size and pattern (large format and mosaics cost more labour), plumbing relocation, whether the drain has to move, and the fixture package. Waterproofing method is a fixed cost we never skip.

費用由什麼決定

格局變動、磁磚尺寸與樣式(大板與馬賽克的人工更貴)、水電移位、排水是否要移、衛浴設備等級。防水工法是一定做、不省的固定成本。

How long it takes

One bathroom: 2–4 weeks. A kitchen: 3–8 weeks. Both at once is usually faster than doing them back to back, because the permit and the site set-up are shared.

工期

一間浴室 2–4 週;廚房 3–8 週。兩者一起做通常比先後做快,因為建照與工地設置可以共用。

Questions we get asked

常見問題

How long does a bathroom remodel take in Cupertino?

Two to four weeks for a full rebuild, plus permit time. Tile and waterproofing need curing days that cannot be rushed, so a shorter promise usually means someone is skipping a step.

Can you convert my tub into a walk-in shower?

Usually yes. It depends on the drain position and the framing, and if you want a curbless entry we check the joist depth before promising it.

Do you handle the permit for a bathroom?

Yes. Plumbing and electrical changes need a permit and inspection in Cupertino; we prepare and submit it.

Will the rest of the house be usable during the work?

Yes for a bathroom — we keep the other bathroom working and seal the work area. For a kitchen we set up a temporary sink and cooking area.

Recent work 相關工程

Free on-site estimate   Call 408-966-0885