A structural remodel in progress: the house was opened up, the roof replaced and new framing installed. The photo set documents demolition, framing and the new roof line.
These are our own site photographs, taken across the build — the album below has every one of them, from the first day of demolition to the finished rooms.
進行中的結構翻新:房子被打開重整、屋頂更新、新骨架安裝。照片完整記錄拆除、骨架與新屋頂線。
以下都是我們自己在工地拍的照片,完整相簿包含全部 109 張 —— 從拆除第一天到完工後的樣子。
View the full album (109 photos)